In units in which the function of redundant operation is en-abled, the Power Peak option can be activated, thanks to which in the case of an increased power demand, both units are started up. The aim is to bring the system to the target and optimal working conditions as soon as possible.
This is the case, for example, at the first start-up or stoppage when the cooling chamber needs to reach the set temperature. Thanks to this, in the case of planned stoppages, it is possible to quickly recover the full efficiency of the entire system.